Creating a schedule for multiple locations requires more than just assigning available names to a shift. You want roles, locations, qualifications, and agreements to hold true in practice. With a standardized working method, you prevent the planner from having to resolve exceptions time and again.
Goal: Structure the schedule for multiple locations in such a way that the planning remains feasible, explainable, and verifiable.
Why this requires special attention
A schedule may appear complete on paper yet remain vulnerable. The right person must be available at the right time, in the right place, and with the right authority. Additionally, swaps, blocks, caps, and lock moments must continue to follow the same rules.
- Availability alone is not enoughAlso check role, skill, and practical feasibility.
- Work from a single current sourceSeparate lists and text messages should not replace the schedule.
- Make exceptions visibleDeviations are part of an approval and a brief audit.
- Measure recurring bottlenecksA pattern calls for structural improvement.
Practical step-by-step plan
| Step | Part | Action |
|---|---|---|
| 1 | Primary and additional locations | Record and check |
| 2 | Travel time between locations | Record and check |
| 3 | Skills by location | Record and check |
| 4 | Location-based shortlists | Record and check |
| 5 | Management rights per location | Record and check |
Step-by-step approach
Step 1. Primary and additional locations
Make primary and additional locations part of the fixed scheduling workflow. Clearly document the rule, assign an owner, and verify the outcome before the schedule is finalized.
Step 2. Travel time between locations
Make travel time between locations part of the fixed scheduling workflow. Clearly document the rule, assign an owner, and verify the outcome before the schedule is finalized.
Step 3. Skills by location
Make skills per location part of the fixed scheduling workflow. Clearly document the rule, assign an owner, and verify the outcome before the schedule is finalized.
Step 4. Location-based shortlists
Make location-based shortlists part of the standard scheduling workflow. Clearly define the rule, assign an owner, and verify the outcome before the schedule is finalized.
Step 5. Management rights per location
Make management rights per location part of the standard scheduling workflow. Clearly document the rule, assign an owner, and verify the outcome before the schedule is finalized.
Use caps, locks, and approvals
Not every change needs to be manually approved. Allow normal changes to proceed automatically when availability, skills, caps, and minimum staffing levels are green. Request approval as soon as a critical role, late change, cap overrun, or other exception arises.
Basic rule: a change is only final when it appears in the schedule and the persons involved have received a confirmation.
Communication to the team
Keep messages brief. Include the date, time, location, role, and any required action. Always refer back to the schedule as the source of truth. This prevents screenshots or individual messages from being reused later.
Measuring what can be improved
- Fill level before lockIs the schedule firmly in place on time?
- Late changesHow often are changes still made within 24 or 48 hours?
- Rejected changesWhich rules cause blocking most often?
- Backup coverageWhich roles or locations have too few alternatives?
- FairnessIs the extra or heavy stake distributed fairly?
Frequently asked questions
Must every exception be approved
No. Only changes that fall outside the normal guardrails require approval.
How do you prevent the schedule from becoming too complicated?
Use only rules, skills, and statuses that genuinely impact deployability or safety.
When will you adjust the working method
If the same problem recurs across multiple scheduling periods, resolve patterns structurally instead of manually every week.
Get started now
- Primary and additional locations.
- Travel time between locations.
- Skills by location.
- Location-based shortlists.
- Management rights per location.
- Evaluate the result after one full scheduling period.
With clear rules and a single central scheduling source, scheduling across multiple locations becomes more manageable, and the planner needs to rely less on incidents.
Go back to the overview